Change Notifications

for Products, Processes and Documents

NewAge Industries Change Notification Policy:
NewAge established and maintains a Documented Change process for all products, major processes or documentation related changes.

A Documented Change relates to a significant process or material change such as the elimination of a process, equipment relocation, change of a raw material, design or configuration changes, drawing revisions, packaging, external processes (i.e. gamma irradiation), etc. or a process change that requires engineering based study and process monitoring to validate the effect of the change.

It is NewAge's policy to inform our customers about changes a minimum of 90 days prior to the implementation of the change. Occasionally however, unique circumstances may require us to make immediate changes when in the best interests of our customer base or in unavoidable situations that need immediate action.

The following change notifications do not pertain to custom products. Custom products consist of those products manufactured or customized for a specific customer and undergo a separate change notification and approval process involving only NewAge and the customer to preserve confidentiality.

Please note that these notifications are relevant to products purchased in the last 36 months and will be removed from the website 24 months after the posting date. An email notification will be sent to customers, prior to posting the change notification on the website.

For additional queries concerning our change notifications, please contact us at compliance@newageindustries.com.


Documented Change Notifications

To view or download printable PDF copies, click on the links in the chart below.

DCR Number Effective Date Part Number Affected / Description of Change
  September 22, 2017 APFRC Rubber-Covered FEP Hose / This letter states that effective immediately, NewAge Industries AdvantaPure can no longer supply our APFRC Rubber-Covered FEP Hose product line due to our supplier's violation of our mutually agreed to Quality Agreement.
1548 August 02, 2017 APST Silicone Molded Manifold 135 Master Device / Due to an increased demand for larger, more complex manifolds, AdvantaPure has expanded the Sterile Silicone Product Family offering by creating a larger and more complex master device. The size and configuration of the APST master device has been changed to include more components and molded junctions.
As a result of creating the larger, more complex master device, the verification dose has been adjusted accordingly. All testing of the manifold and validated components are compliant with the requirements of ISO Standards 11137-1:2006/R2011 and 11137-2:2013.
1443 November 22, 2016 A772 (APFOSJ-W) and A782 (APFOSJ-WC) Silicone Jacketed, Stainless Steel Overbraided PTFE Hose / Bulk hose orders for the A772 and A782 will have ± 1% length tolerance
1441 November 07, 2016 APSM (A715, A716, CA715, CA716) / NewAge Industries AdvantaPure has discontinued supplying APSM 4-Ply Mandrel-Wrapped Platinum Cured Silicone Hose.
1326 March 21, 2016 APST (A700, CA700), APSH (A710, CA710), APSPG (A702, CA702), APSH-DB (A714, CA714), APSM-P (A715, CA715), APSW-P (A725, CA725), APSW-PC (A727 ,CA727), PLATINUM SILICONE 60A (CA703) / Installation of a modular ISO Class 7 packaging room within the platinum silicone extrusion suite.
1116 October 03, 2016 Certificate of Analysis (C of A), Certificate of Conformance (C of C) / Format Revisions to the C of A and C of C

Note: Change notifications for custom products or products containing proprietary information are not listed above. Please contact us with any questions.


| Home | Products | News & Events | About Us | Find a Distributor | Information Request | Contact Us |
| Tubing & Hose | Fittings | Single-Use Systems | Molded Products | Custom Products & Services | Hose Identification | Product Videos |
| Legal Notices & Trademarks | Terms & Conditions of Sale | Privacy Policy | Feedback/Questions | Site Map |

facebook    linkedin    twitter    google plus    youtube